Jodhpur (Under Municipal Corporation)

Eiffil has implemented a sensor-based monitoring system for critical low-lying manholes. This system allows real-time level tracking and is accessible from both the Municipal Corporation’s main computer and authorized officials’ mobile devices.

Key Highlight:

  • Providing & Laying Non Metallic Pipes (200mm – 800 mm Dia. –DWC HDPE Pipe)- 22848 RMT
  • Providing & Laying Non Metallic Pipes (900 mm Dia. to 1200 mm Dia. – RCC NP3 Pipe)- 3306 RMT
  • Earthwork- 86595 CMT
  • HDPE Pipe Laying by Micro Tunneling / Trenchless Method ( 200 mm to 900 mm Dia.) – 8171 RMT
  • DI K7 Pipe Laying ( 150 mm to 250 mm Dia.) – 228 RMT
  • House Connection Chambers- 3450 NOS
  • Pre-Cast RCC Circular Manhole – 1749 Nos

 

Benefits:

  • Operational costs reduction.
  • Reduce cleaning costs by ensuring timely cleaning.
  • Real-time sewage water level status of manholes.
  • Optional real-time alarms to reduce response time & damage compensations, and liability.
  • Prevent any outbreak of diseases.
  • Overall improvement in the environment for the citizens